Dahiuchang Limestone Quarry Railway |
||
|
Located south of Beijing the 762mm double track railway transported limestone about a kilometer from the quarry to the cement works. The line was worked by the ubiquitous class C2 0-8-0 tender locomotives. At the quarry the train was propelled into a tunnel were the wagons were loaded from a bunker fed from the quarry. At the tippler house the loco was detached from the train and the wagons moved by gravity through the tippler with progress being regulated by a man sticking a steel bar into a hole in a wheel! Half way along the line was a level crossing. Approaching the crossing a bar on the cab roof operated a contact which rang a bell in the crossing keepers hut as a signal to him to lower the barriers. |
||
|
Click on an image to enlarge
|
||